Demolition of Downtown Plaza, soon to be the site of a new arena for the Sacramento Kings, began Wednesday morning. Buildings were excavated along L Street, between 4th to 6th streets. The area included the Downtown Plaza sign, as well as the landmark PreFlite Lounge. The arena is scheduled to open in October 2016.
Photos by Steve Martarano